UZUNDERE HEPP PROJECT
 

UZUNDERE HEPP PROJECT



The Project aims to use the hydroelectric potential energy of Uzundere and İncesu rivers who are born in the most speedily mounting summits of Kackar Mountains, reaching 3.000-3.500 metres of altitude in East Black Sea region.

The catchment basins are the most and orderly rainy areas of Turkey, exceeding 2.500mm yearly rain fall per m2.

With their highly rainy valleys, and their river bed slopes exceeding 10%, Uzundere and Incesu Rivers make Uzundere 1 project signifantly big in size and high in IRR compared to other river type power plants.

 

PROJE GENEL BİLGİLERİ

PROJECT GENERAL CHARACTHERISTICS
Proje İsmi UZUNDERE 1 HES Project  Name UZUNDERE 1 HEPP
Kurulu Güç 43,60 MW Potential Power 43,60 MW
Üretim 219.190.800 Kw Production 219.190.800 Kw
Santral Tipi Nehir Santrali Type of Power Plant River Type
Üretim Planlama Sadece Pik Saatler Production Planing Only Peak Hours
Çalışma Prensibi Tam Kapasite/Günlük Rezervuar Operation Full Load/Daily Reservoir
Satış Fiyatı 8,32 Ykr/kWh Selling Price 8,32 Ykr / kWh
İnşaat Süresi 19 Ay Construction Period 19 Months
Devreye Alma Eylül 2007 Commissioning September 2007

 

TEKNİK VERİLER
Regülatör & Su Alma Yapısı

TECHNICAL DATAS
Regulator & Water Intake Structure

Regülatör  Kot 1.564.30 M Weir Altitude 1.755.00M
Tünel Uzunluğu 5.480m+5.630m Tunnel Length 5.480m+630m
Yaklaşım Ağzı Sayısı 5 Number of Approach to tunnel 5
Tünel Çapı 3,20m Tunnel Diameter 3,20m
Cebri Boru Uzunluğu 2.577m Penstock Length 2.577m
Cebri Boru Çapı 1,57m Penstock Diameter 1,57m


 

TÜRBİN

TURBINE

Tipi Dikey Pelton Turbine Type Vertical Pelton
Ünite Adedi 2 Ünite Number of Units 2 Units
Ünite Gücü 21.80MWm Unit Power 21.80MWm
Brüt düşü 733,75m Gross Head 733,75m
Net Düşü 699,69m Net Head 699,69m
İki Ünite Operasyonda 523,95m 2 units in operation 523,95m
Nominal hız 750 Devir Nominal Speed 750 rpm
Üretici Firma Alstom İspanya Supplier Alstom Spain

 

JENERATÖR

GENERATOR

Nominal Güç 62 MWA Nominal Output 62MWA
Nominal Voltaj 11 KV Nominal Voltage 11 KV
Frekans 50Hz Frequency 50Hz
Soğutma Sistemi Su Soğutmalı Cooling System Water Cooling
Nakil Hattı 154 KV Transmission Line 154 KV
Üretici Firma Alstom İspanya Supplier Alstom Spain

 

HİDROLOJİ

HYDROLOGY

Drenaj Alanı 98.46 Km2 Catchement Area 98.46 Km2
Regülasyon Tipi Günlük Regülasyon Weir Type Daily Regulation
Rezervuar Kapasitesi 80.000 m3 Reservuar Capacity 80.000 m3
Proje Debisi 9.5m3/ sn Project Flow 9.5m3/ sn
Yıllık Ortalama Debi 3.618m3/sn Average Flow 3.618m3/sn





Uzundere Deresinden Genel Bir Görünüm    -   Picture of Uzundere  River


 

Main  |  Projects |  HydroEnergy  |  Environment |  About Us  |  Contact
 
Copyright (c) 2007.
Hidrokontrol.cc
replica hermes handbags, celine boston bags, louis vuitton outlet, outlet canada goose, Canada Goose Online Outlet Cheap Canada Goose men jacket Canada Goose women whistle http://www.darlenemccoy.com/ Moncler Cachalot sale celine Canada Goose moncler femme soldes ¨C moncler soldes homme hermes belt outlet celine replica prada bags online canada goose parka outlet celine handbags online canada goose parka prada outlet bags hermes handbags for sale trong>Canada Goose Jackets
replica hermes birkin, celine outlet online, louis vuitton bags, canada goose outlet store, Cheap Canada Goose Canada Goose Men parkas Canada Goose Black jacket louis vuitton wallets Moncler louis vuitton 2015 Canada Goose doudoune moncler pas cher femme birkin bag outlet celine phantom bags prada bags cheap canada goose parka outlet celine handbags online canada goose Coats sale prada bags replica kelly bag replica trong>Canada Goose online